| Preconstruction |
|
|
|
PRELIMINARY DISCOVERYVisit the site with architect and owner to assess all existing conditions. Perform selective demolition, if necessary, to expose hidden areas of the structure. Contact testing agencies should it be deemed necessary.
PRELIMINARY BUDGET ESTIMATEBased on the desires of the architect and owner as well as the existing site conditions a preliminary estimate can be compiled with breakdowns showing cost allocations. This can facilitate the design process in meeting budget requirements.
PRELIMINARY SCHEDULEBased on the scope of work, milestone dates of the owner, time of year, etc a preliminary schedule can be developed for the design, permitting and constructions process.
|